US Bridges

Front Street over Willis Avenue

Good

Nassau County, New York · Willis Ave 0.6 MI S of Ny · Structure no. 000000002271450

Built
2021
4 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
32 ft
1 main span
Daily traffic
—
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Front Street over Willis Avenue is a prestressed concrete box beam or girders - multiple carrying Front Street over Willis Avenue in Nassau County, New York. It was built in 2021, so it is 4 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 32 ft (9.8 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFront Street
CrossesWillis Avenue
LocationWillis Ave 0.6 MI S of Ny
RouteCity Street 0
Coordinates40.74121, -73.63664
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating110.1 US tons
Inventory rating87 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length32 ft (9.8 m)
Longest span27 ft (8.2 m)
Deck width33 ft (10.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.5 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Front Street over Willis Avenue built?

It was built in 2021, making it 4 years old in 2025.

What condition is Front Street over Willis Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Front Street over Willis Avenue carry?

No traffic count is recorded for this structure.

How long is Front Street over Willis Avenue?

The structure is 32 ft (9.8 m) long with a longest span of 27 ft (8.2 m) and a deck 33 ft wide.

Who owns Front Street over Willis Avenue?

It is owned by the Town or Township Highway Agency.