RTE 908C over Swift Creek
GoodNassau County, New York · Near East Bay in Nassau · Structure no. 000000001056779
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 667 ft
- 10 main spans
- Daily traffic
- 25,774
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 908C over Swift Creek is a prestressed concrete continuous box beam or girders - multiple carrying RTE 908C over Swift Creek in Nassau County, New York. It was built in 1999, so it is 26 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,774 vehicles a day, roughly 1% of them trucks, projected to reach 30,658 by 2041. The structure is 667 ft (203.3 m) long and 76 ft wide. If it were closed, the detour would be 15.5 mi (25 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 908C over Swift Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is RTE 908C over Swift Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does RTE 908C over Swift Creek carry?
About 25,774 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is RTE 908C over Swift Creek?
The structure is 667 ft (203.3 m) long with a longest span of 75 ft (22.8 m) and a deck 76 ft wide.
Who owns RTE 908C over Swift Creek?
It is owned by the State Highway Agency.