Fort Hunter Road over S Chuctanunda Crk
GoodMontgomery County, New York · .2 Mile NW of Minaville · Structure no. 000000003310190
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 95 ft
- 1 main span
- Daily traffic
- 596
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Fort Hunter Road over S Chuctanunda Crk is a prestressed concrete box beam or girders - multiple carrying Fort Hunter Road over S Chuctanunda Crk in Montgomery County, New York. It was built in 2017, so it is 8 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 596 vehicles a day, roughly 12% of them trucks, projected to reach 834 by 2041. The structure is 95 ft (29 m) long and 33 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fort Hunter Road over S Chuctanunda Crk built?
It was built in 2017, making it 8 years old in 2025.
What condition is Fort Hunter Road over S Chuctanunda Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Fort Hunter Road over S Chuctanunda Crk carry?
About 596 vehicles per day (2021 count), of which roughly 12% are trucks.
How long is Fort Hunter Road over S Chuctanunda Crk?
The structure is 95 ft (29 m) long with a longest span of 90 ft (27.4 m) and a deck 33 ft wide.
Who owns Fort Hunter Road over S Chuctanunda Crk?
It is owned by the County Highway Agency.