William Street over Zimmerman Creek
GoodMontgomery County, New York · At ST Johnsville · Structure no. 000000002266900
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 146
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
William Street over Zimmerman Creek is a prestressed concrete box beam or girders - multiple carrying William Street over Zimmerman Creek in Montgomery County, New York. It was built in 2000, so it is 25 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 146 vehicles a day, roughly 15% of them trucks, projected to reach 204 by 2039. The structure is 31 ft (9.4 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was William Street over Zimmerman Creek built?
It was built in 2000, making it 25 years old in 2025.
What condition is William Street over Zimmerman Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does William Street over Zimmerman Creek carry?
About 146 vehicles per day (2019 count), of which roughly 15% are trucks.
How long is William Street over Zimmerman Creek?
The structure is 31 ft (9.4 m) long with a longest span of 30 ft (9.1 m) and a deck 43 ft wide.
Who owns William Street over Zimmerman Creek?
It is owned by the Town or Township Highway Agency.