RTE 250 over Erie Canal Trailway Eri
GoodPosted for loadMonroe County, New York · JCT Barge C&rte 31F · Structure no. 000000004443220
- Built
- 1914
- 111 years old, rebuilt 2021
- Condition
- Good
- inspected November 2023
- Type
- Movable - Lift
- Steel
- Length
- 175 ft
- 1 main span
- Daily traffic
- 10,027
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 250 over Erie Canal Trailway Eri is a steel movable - lift carrying RTE 250 over Erie Canal Trailway Eri in Monroe County, New York. It was built in 1914 and reconstructed in 2021, so it is 111 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for other load-capacity restriction.
It carries about 10,027 vehicles a day, roughly 3% of them trucks, projected to reach 10,074 by 2041. The structure is 175 ft (53.3 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 250 over Erie Canal Trailway Eri built?
It was built in 1914, making it 111 years old in 2025. It was reconstructed in 2021.
What condition is RTE 250 over Erie Canal Trailway Eri in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does RTE 250 over Erie Canal Trailway Eri carry?
About 10,027 vehicles per day (2018 count), of which roughly 3% are trucks.
How long is RTE 250 over Erie Canal Trailway Eri?
The structure is 175 ft (53.3 m) long with a longest span of 139 ft (42.3 m) and a deck 39 ft wide.
Who owns RTE 250 over Erie Canal Trailway Eri?
It is owned by the State Highway Agency.