US Bridges

RTE 65 over Honeoye Creek

Good

Monroe County, New York · 2.7 MI S JCT Rts 65 & 251 · Structure no. 000000001028950

Built
1996
29 years old
Condition
Good
inspected May 2024
Type
Arch - Deck
Concrete
Length
66 ft
1 main span
Daily traffic
4,422
2021 count
Owner
State
State Highway Agency

About this bridge

RTE 65 over Honeoye Creek is a concrete arch - deck carrying RTE 65 over Honeoye Creek in Monroe County, New York. It was built in 1996, so it is 29 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,422 vehicles a day, roughly 6% of them trucks, projected to reach 4,542 by 2041. The structure is 66 ft (20.2 m) long and 41 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesRTE 65
CrossesHoneoye Creek
Location2.7 MI S JCT Rts 65 & 251
RouteState Highway 65
Coordinates42.95681, -77.58879
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95.3 US tons
Inventory rating45 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length66 ft (20.2 m)
Longest span64 ft (19.5 m)
Deck width41 ft (12.6 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,422 (2021)
Projected traffic4,542 by 2041
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3.5 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 65 over Honeoye Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is RTE 65 over Honeoye Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does RTE 65 over Honeoye Creek carry?

About 4,422 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is RTE 65 over Honeoye Creek?

The structure is 66 ft (20.2 m) long with a longest span of 64 ft (19.5 m) and a deck 41 ft wide.

Who owns RTE 65 over Honeoye Creek?

It is owned by the State Highway Agency.