RTE I390 over RTE 36
PoorLivingston County, New York · Int of Rts 36 + I390 · Structure no. 000000001063762
- Built
- 1966
- 59 years old
- Condition
- Poor
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 305 ft
- 3 main spans
- Daily traffic
- 5,663
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I390 over RTE 36 is a steel stringer/multi-beam or girder carrying RTE I390 over RTE 36 in Livingston County, New York. It was built in 1966, so it is 59 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 5,663 vehicles a day, roughly 29% of them trucks, projected to reach 7,875 by 2041. The structure is 305 ft (93 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I390 over RTE 36 built?
It was built in 1966, making it 59 years old in 2025.
What condition is RTE I390 over RTE 36 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2024.
How much traffic does RTE I390 over RTE 36 carry?
About 5,663 vehicles per day (2019 count), of which roughly 29% are trucks.
How long is RTE I390 over RTE 36?
The structure is 305 ft (93 m) long with a longest span of 141 ft (42.9 m) and a deck 32 ft wide.
Who owns RTE I390 over RTE 36?
It is owned by the State Highway Agency.