RTE 12 over Mohawk Adirondack & Nort
FairLewis County, New York · .2 MI S JCT SH12 & SH 12D · Structure no. 000000001009560
- Built
- 1950
- 75 years old, rebuilt 1994
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 76 ft
- 1 main span
- Daily traffic
- 5,391
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 12 over Mohawk Adirondack & Nort is a steel stringer/multi-beam or girder carrying RTE 12 over Mohawk Adirondack & Nort in Lewis County, New York. It was built in 1950 and reconstructed in 1994, so it is 75 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,391 vehicles a day, roughly 13% of them trucks, projected to reach 5,442 by 2041. The structure is 76 ft (23.2 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 12 over Mohawk Adirondack & Nort built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1994.
What condition is RTE 12 over Mohawk Adirondack & Nort in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does RTE 12 over Mohawk Adirondack & Nort carry?
About 5,391 vehicles per day (2016 count), of which roughly 13% are trucks.
How long is RTE 12 over Mohawk Adirondack & Nort?
The structure is 76 ft (23.2 m) long with a longest span of 67 ft (20.4 m) and a deck 43 ft wide.
Who owns RTE 12 over Mohawk Adirondack & Nort?
It is owned by the State Highway Agency.