RTE 907C over Bedford Avenue
FairKings County, New York · In Sheepshead Bay · Structure no. 000000002231429
- Built
- 1942
- 83 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 143 ft
- 3 main spans
- Daily traffic
- 132,147
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
RTE 907C over Bedford Avenue is a steel stringer/multi-beam or girder carrying RTE 907C over Bedford Avenue in Kings County, New York. It was built in 1942, so it is 83 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 132,147 vehicles a day, roughly 1% of them trucks, projected to reach 162,937 by 2041. The structure is 143 ft (43.6 m) long and 84 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 907C over Bedford Avenue built?
It was built in 1942, making it 83 years old in 2025.
What condition is RTE 907C over Bedford Avenue in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does RTE 907C over Bedford Avenue carry?
About 132,147 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is RTE 907C over Bedford Avenue?
The structure is 143 ft (43.6 m) long with a longest span of 53 ft (16.1 m) and a deck 84 ft wide.
Who owns RTE 907C over Bedford Avenue?
It is owned by the City or Municipal Highway Agency.