Lee Avenue over RTE I278 RTE I278
FairKings County, New York · 2.8 MI SW JCT I278+I495 · Structure no. 000000001065470
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 112 ft
- 2 main spans
- Daily traffic
- 11,013
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Lee Avenue over RTE I278 RTE I278 is a steel stringer/multi-beam or girder carrying Lee Avenue over RTE I278 RTE I278 in Kings County, New York. It was built in 1958, so it is 67 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,013 vehicles a day, roughly 4% of them trucks, projected to reach 11,064 by 2041. The structure is 112 ft (34.1 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lee Avenue over RTE I278 RTE I278 built?
It was built in 1958, making it 67 years old in 2025.
What condition is Lee Avenue over RTE I278 RTE I278 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Lee Avenue over RTE I278 RTE I278 carry?
About 11,013 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is Lee Avenue over RTE I278 RTE I278?
The structure is 112 ft (34.1 m) long with a longest span of 52 ft (15.8 m) and a deck 63 ft wide.
Who owns Lee Avenue over RTE I278 RTE I278?
It is owned by the State Highway Agency.