West German ST over Bellinger Brook
GoodHerkimer County, New York · Village of Herkimer · Structure no. 000000002266820
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 83 ft
- 1 main span
- Daily traffic
- 4,335
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
West German ST over Bellinger Brook is a prestressed concrete box beam or girders - multiple carrying West German ST over Bellinger Brook in Herkimer County, New York. It was built in 2024, so it is 1 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,335 vehicles a day, roughly 4% of them trucks, projected to reach 5,266 by 2041. The structure is 83 ft (25.3 m) long and 52 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West German ST over Bellinger Brook built?
It was built in 2024, making it 1 years old in 2025.
What condition is West German ST over Bellinger Brook in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does West German ST over Bellinger Brook carry?
About 4,335 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is West German ST over Bellinger Brook?
The structure is 83 ft (25.3 m) long with a longest span of 75 ft (22.9 m) and a deck 52 ft wide.
Who owns West German ST over Bellinger Brook?
It is owned by the Town or Township Highway Agency.