RTE 8 over Sheriff Lake Outlet
GoodHamilton County, New York · 2.3 MI W JCT SH 8 & SH 10 · Structure no. 000000001004770
- Built
- 1950
- 75 years old, rebuilt 2019
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 33 ft
- 1 main span
- Daily traffic
- 1,092
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 8 over Sheriff Lake Outlet is a steel stringer/multi-beam or girder carrying RTE 8 over Sheriff Lake Outlet in Hamilton County, New York. It was built in 1950 and reconstructed in 2019, so it is 75 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,092 vehicles a day, roughly 13% of them trucks, projected to reach 1,098 by 2041. The structure is 33 ft (10.1 m) long and 37 ft wide. If it were closed, the detour would be 63.4 mi (102 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 8 over Sheriff Lake Outlet built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 2019.
What condition is RTE 8 over Sheriff Lake Outlet in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does RTE 8 over Sheriff Lake Outlet carry?
About 1,092 vehicles per day (2020 count), of which roughly 13% are trucks.
How long is RTE 8 over Sheriff Lake Outlet?
The structure is 33 ft (10.1 m) long with a longest span of 31 ft (9.4 m) and a deck 37 ft wide.
Who owns RTE 8 over Sheriff Lake Outlet?
It is owned by the State Highway Agency.