Wright Road over Stoney Clove Crk
GoodGreene County, New York · 1 MI NE Lanesville · Structure no. 000000003201070
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 69 ft
- 1 main span
- Daily traffic
- 3
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Wright Road over Stoney Clove Crk is a prestressed concrete box beam or girders - multiple carrying Wright Road over Stoney Clove Crk in Greene County, New York. It was built in 1997, so it is 28 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3 vehicles a day, roughly 10% of them trucks, projected to reach 4 by 2038. The structure is 69 ft (21 m) long and 18 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wright Road over Stoney Clove Crk built?
It was built in 1997, making it 28 years old in 2025.
What condition is Wright Road over Stoney Clove Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Wright Road over Stoney Clove Crk carry?
About 3 vehicles per day (2018 count), of which roughly 10% are trucks.
How long is Wright Road over Stoney Clove Crk?
The structure is 69 ft (21 m) long with a longest span of 64 ft (19.5 m) and a deck 18 ft wide.
Who owns Wright Road over Stoney Clove Crk?
It is owned by the County Highway Agency.