Hervey Street over Thorpe Creek
GoodGreene County, New York · 4 MI SE Durham · Structure no. 000000003200920
- Built
- 1974
- 51 years old, rebuilt 2018
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 66
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Hervey Street over Thorpe Creek is a prestressed concrete box beam or girders - multiple carrying Hervey Street over Thorpe Creek in Greene County, New York. It was built in 1974 and reconstructed in 2018, so it is 51 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 66 vehicles a day, roughly 10% of them trucks, projected to reach 92 by 2041. The structure is 30 ft (9 m) long and 24 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hervey Street over Thorpe Creek built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 2018.
What condition is Hervey Street over Thorpe Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Hervey Street over Thorpe Creek carry?
About 66 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is Hervey Street over Thorpe Creek?
The structure is 30 ft (9 m) long with a longest span of 28 ft (8.5 m) and a deck 24 ft wide.
Who owns Hervey Street over Thorpe Creek?
It is owned by the County Highway Agency.