Steinmetz Road over Batavia Kill Tri
GoodGreene County, New York · 2.3 MI NW Windham · Structure no. 000000003200550
- Built
- 1961
- 64 years old, rebuilt 2016
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 147
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Steinmetz Road over Batavia Kill Tri is a prestressed concrete box beam or girders - multiple carrying Steinmetz Road over Batavia Kill Tri in Greene County, New York. It was built in 1961 and reconstructed in 2016, so it is 64 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 147 vehicles a day, roughly 10% of them trucks, projected to reach 206 by 2040. The structure is 47 ft (14.3 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Steinmetz Road over Batavia Kill Tri built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 2016.
What condition is Steinmetz Road over Batavia Kill Tri in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Steinmetz Road over Batavia Kill Tri carry?
About 147 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Steinmetz Road over Batavia Kill Tri?
The structure is 47 ft (14.3 m) long with a longest span of 43 ft (13.1 m) and a deck 23 ft wide.
Who owns Steinmetz Road over Batavia Kill Tri?
It is owned by the County Highway Agency.