CR 4 over 90IX RTE I90
FairGenesee County, New York · 3.7 MI E Int Rt 77 & I90 · Structure no. 000000005315350
- Built
- 1954
- 71 years old, rebuilt 1978
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 252 ft
- 4 main spans
- Daily traffic
- 1,018
- 2021 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
CR 4 over 90IX RTE I90 is a steel stringer/multi-beam or girder carrying CR 4 over 90IX RTE I90 in Genesee County, New York. It was built in 1954 and reconstructed in 1978, so it is 71 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,018 vehicles a day, roughly 10% of them trucks, projected to reach 1,425 by 2041. The structure is 252 ft (76.8 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 4 over 90IX RTE I90 built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1978.
What condition is CR 4 over 90IX RTE I90 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does CR 4 over 90IX RTE I90 carry?
About 1,018 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is CR 4 over 90IX RTE I90?
The structure is 252 ft (76.8 m) long with a longest span of 77 ft (23.5 m) and a deck 33 ft wide.
Who owns CR 4 over 90IX RTE I90?
It is owned by the State Toll Authority.