Darien-Alexander over Tunnery Creek
GoodGenesee County, New York · 3.3 MI SW Alexander · Structure no. 000000003315610
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 325
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Darien-Alexander over Tunnery Creek is a prestressed concrete box beam or girders - multiple carrying Darien-Alexander over Tunnery Creek in Genesee County, New York. It was built in 2022, so it is 3 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 325 vehicles a day, roughly 4% of them trucks, projected to reach 455 by 2041. The structure is 51 ft (15.6 m) long and 33 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Darien-Alexander over Tunnery Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is Darien-Alexander over Tunnery Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Darien-Alexander over Tunnery Creek carry?
About 325 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is Darien-Alexander over Tunnery Creek?
The structure is 51 ft (15.6 m) long with a longest span of 48 ft (14.6 m) and a deck 33 ft wide.
Who owns Darien-Alexander over Tunnery Creek?
It is owned by the County Highway Agency.