- Built
- 2018
- 7 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 101 ft
- 1 main span
- Daily traffic
- 1,218
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Bethany Center Roa over RTE 20 is a steel stringer/multi-beam or girder carrying Bethany Center Roa over RTE 20 in Genesee County, New York. It was built in 2018, so it is 7 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,218 vehicles a day, roughly 8% of them trucks, projected to reach 1,705 by 2041. The structure is 101 ft (30.8 m) long and 38 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bethany Center Roa over RTE 20 built?
It was built in 2018, making it 7 years old in 2025.
What condition is Bethany Center Roa over RTE 20 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Bethany Center Roa over RTE 20 carry?
About 1,218 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is Bethany Center Roa over RTE 20?
The structure is 101 ft (30.8 m) long with a longest span of 95 ft (29 m) and a deck 38 ft wide.
Who owns Bethany Center Roa over RTE 20?
It is owned by the State Highway Agency.