RTE I90 over RTE 5
FairGenesee County, New York · JCT Rts 5 & I90 Pembroke · Structure no. 000000001001679
- Built
- 1954
- 71 years old, rebuilt 1998
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 185 ft
- 3 main spans
- Daily traffic
- 40,540
- 2020 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
RTE I90 over RTE 5 is a steel stringer/multi-beam or girder carrying RTE I90 over RTE 5 in Genesee County, New York. It was built in 1954 and reconstructed in 1998, so it is 71 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40,540 vehicles a day, roughly 32% of them trucks, projected to reach 49,726 by 2041. The structure is 185 ft (56.4 m) long and 123 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I90 over RTE 5 built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1998.
What condition is RTE I90 over RTE 5 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does RTE I90 over RTE 5 carry?
About 40,540 vehicles per day (2020 count), of which roughly 32% are trucks.
How long is RTE I90 over RTE 5?
The structure is 185 ft (56.4 m) long with a longest span of 92 ft (28 m) and a deck 123 ft wide.
Who owns RTE I90 over RTE 5?
It is owned by the State Toll Authority.