RTE 29 over East Canada Creek
FairFulton County, New York · 01 MI E JCT Rts 167+29 · Structure no. 000000001051170
- Built
- 1932
- 93 years old, rebuilt 1981
- Condition
- Fair
- inspected November 2024
- Type
- Truss - Thru
- Steel
- Length
- 184 ft
- 1 main span
- Daily traffic
- 1,608
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 29 over East Canada Creek is a steel truss - thru carrying RTE 29 over East Canada Creek in Fulton County, New York. It was built in 1932 and reconstructed in 1981, so it is 93 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,608 vehicles a day, roughly 10% of them trucks, projected to reach 1,677 by 2041. The structure is 184 ft (56.1 m) long and 27 ft wide. If it were closed, the detour would be 32.9 mi (53 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 29 over East Canada Creek built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1981.
What condition is RTE 29 over East Canada Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does RTE 29 over East Canada Creek carry?
About 1,608 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is RTE 29 over East Canada Creek?
The structure is 184 ft (56.1 m) long with a longest span of 182 ft (55.4 m) and a deck 27 ft wide.
Who owns RTE 29 over East Canada Creek?
It is owned by the State Highway Agency.