Jj Audubon Parkwy over Amherst Bike/ Ped Trail
FairErie County, New York · 1.7 MI N JCT I290 & SH263 · Structure no. 000000002266621
- Built
- 1983
- 42 years old, rebuilt 2020
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 202 ft
- 3 main spans
- Daily traffic
- 3,174
- 2018 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Jj Audubon Parkwy over Amherst Bike/ Ped Trail is a steel stringer/multi-beam or girder carrying Jj Audubon Parkwy over Amherst Bike/ Ped Trail in Erie County, New York. It was built in 1983 and reconstructed in 2020, so it is 42 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,174 vehicles a day, roughly 1% of them trucks, projected to reach 3,351 by 2041. The structure is 202 ft (61.6 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jj Audubon Parkwy over Amherst Bike/ Ped Trail built?
It was built in 1983, making it 42 years old in 2025. It was reconstructed in 2020.
What condition is Jj Audubon Parkwy over Amherst Bike/ Ped Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Jj Audubon Parkwy over Amherst Bike/ Ped Trail carry?
About 3,174 vehicles per day (2018 count), of which roughly 1% are trucks.
How long is Jj Audubon Parkwy over Amherst Bike/ Ped Trail?
The structure is 202 ft (61.6 m) long with a longest span of 79 ft (24 m) and a deck 39 ft wide.
Who owns Jj Audubon Parkwy over Amherst Bike/ Ped Trail?
It is owned by the Town or Township Highway Agency.