US Bridges

Mckinley Parkway over Buffalo & Pittsburgh Rai

Poor

Erie County, New York · 1.5 MI N JCT 62SMOKES Ck · Structure no. 000000002255300

Built
1974
51 years old
Condition
Poor
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
41 ft
1 main span
Daily traffic
4,033
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mckinley Parkway over Buffalo & Pittsburgh Rai is a steel stringer/multi-beam or girder carrying Mckinley Parkway over Buffalo & Pittsburgh Rai in Erie County, New York. It was built in 1974, so it is 51 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 4,033 vehicles a day, roughly 2% of them trucks, projected to reach 4,258 by 2041. The structure is 41 ft (12.5 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesMckinley Parkway
CrossesBuffalo & Pittsburgh Rai
Location1.5 MI N JCT 62SMOKES Ck
RouteCity Street 0
Coordinates42.82888, -78.82009
Functional classUrban Minor Arterial

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.9 US tons
Inventory rating37 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length41 ft (12.5 m)
Longest span37 ft (11.2 m)
Deck width60 ft (18.4 m)
Roadway width50 ft (15.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,033 (2020)
Projected traffic4,258 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$4.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mckinley Parkway over Buffalo & Pittsburgh Rai built?

It was built in 1974, making it 51 years old in 2025.

What condition is Mckinley Parkway over Buffalo & Pittsburgh Rai in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.

How much traffic does Mckinley Parkway over Buffalo & Pittsburgh Rai carry?

About 4,033 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Mckinley Parkway over Buffalo & Pittsburgh Rai?

The structure is 41 ft (12.5 m) long with a longest span of 37 ft (11.2 m) and a deck 60 ft wide.

Who owns Mckinley Parkway over Buffalo & Pittsburgh Rai?

It is owned by the City or Municipal Highway Agency.