RTE 277 over Scajaquada Creek
FairErie County, New York · 0.7 MI N JCT Rts 277 +130 · Structure no. 000000001044330
- Built
- 1948
- 77 years old, rebuilt 2005
- Condition
- Fair
- inspected June 2023
- Type
- Slab
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 21,137
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 277 over Scajaquada Creek is a concrete slab carrying RTE 277 over Scajaquada Creek in Erie County, New York. It was built in 1948 and reconstructed in 2005, so it is 77 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,137 vehicles a day, roughly 3% of them trucks, projected to reach 21,236 by 2041. The structure is 27 ft (8.2 m) long and 95 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 277 over Scajaquada Creek built?
It was built in 1948, making it 77 years old in 2025. It was reconstructed in 2005.
What condition is RTE 277 over Scajaquada Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does RTE 277 over Scajaquada Creek carry?
About 21,137 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is RTE 277 over Scajaquada Creek?
The structure is 27 ft (8.2 m) long with a longest span of 24 ft (7.3 m) and a deck 95 ft wide.
Who owns RTE 277 over Scajaquada Creek?
It is owned by the State Highway Agency.