US Bridges

Beekman Street over Parking Access Road Mnr

Good

Dutchess County, New York · In the City of Beacon · Structure no. 000000002262530

Built
1991
34 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
285 ft
3 main spans
Daily traffic
2,499
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Beekman Street over Parking Access Road Mnr is a steel continuous stringer/multi-beam or girder carrying Beekman Street over Parking Access Road Mnr in Dutchess County, New York. It was built in 1991, so it is 34 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,499 vehicles a day, projected to reach 3,092 by 2041. The structure is 285 ft (87 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesBeekman Street
CrossesParking Access Road Mnr
LocationIn the City of Beacon
RouteCity Street 0
Coordinates41.50406, -73.9846
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating78 US tons
Inventory rating41 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length285 ft (87 m)
Longest span121 ft (36.8 m)
Deck width35 ft (10.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,499 (2020)
Projected traffic3,092 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$7.7 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Beekman Street over Parking Access Road Mnr built?

It was built in 1991, making it 34 years old in 2025.

What condition is Beekman Street over Parking Access Road Mnr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Beekman Street over Parking Access Road Mnr carry?

About 2,499 vehicles per day (2020 count).

How long is Beekman Street over Parking Access Road Mnr?

The structure is 285 ft (87 m) long with a longest span of 121 ft (36.8 m) and a deck 35 ft wide.

Who owns Beekman Street over Parking Access Road Mnr?

It is owned by the City or Municipal Highway Agency.