US Bridges

County Road 41 over W Settlement Creek

Fair

Delaware County, New York · 2.4 Miles SW of Roxbury · Structure no. 000000003353170

Built
1961
64 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
23 ft
1 main span
Daily traffic
553
2020 count
Owner
County
County Highway Agency

About this bridge

County Road 41 over W Settlement Creek is a steel stringer/multi-beam or girder carrying County Road 41 over W Settlement Creek in Delaware County, New York. It was built in 1961, so it is 64 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 553 vehicles a day, roughly 8% of them trucks, projected to reach 774 by 2040. The structure is 23 ft (7 m) long and 23 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty Road 41
CrossesW Settlement Creek
Location2.4 Miles SW of Roxbury
RouteCounty Highway 0
Coordinates42.26289, -74.59974
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating103.9 US tons
Inventory rating61.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length23 ft (7 m)
Longest span20 ft (6 m)
Deck width23 ft (7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic553 (2020)
Projected traffic774 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$664,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 41 over W Settlement Creek built?

It was built in 1961, making it 64 years old in 2025.

What condition is County Road 41 over W Settlement Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does County Road 41 over W Settlement Creek carry?

About 553 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is County Road 41 over W Settlement Creek?

The structure is 23 ft (7 m) long with a longest span of 20 ft (6 m) and a deck 23 ft wide.

Who owns County Road 41 over W Settlement Creek?

It is owned by the County Highway Agency.