RTE 11 over Dry Creek

Fair

Cortland County, New York · 0.6 MI N JCT Rts 11 & 222 · Structure no. 000000002207850

Built
1991
34 years old
Condition
Fair
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
29 ft
1 main span
Daily traffic
6,387
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

RTE 11 over Dry Creek is a prestressed concrete box beam or girders - multiple carrying RTE 11 over Dry Creek in Cortland County, New York. It was built in 1991, so it is 34 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,387 vehicles a day, roughly 5% of them trucks, projected to reach 7,758 by 2041. The structure is 29 ft (8.8 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 11
CrossesDry Creek
Location0.6 MI N JCT Rts 11 & 222
RouteU.S. Route 11
Coordinates42.60782, -76.18482
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating52 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span24 ft (7.3 m)
Deck width58 ft (17.8 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,387 (2018)
Projected traffic7,758 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$1.3 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 11 over Dry Creek built?

It was built in 1991, making it 34 years old in 2025.

What condition is RTE 11 over Dry Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does RTE 11 over Dry Creek carry?

About 6,387 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is RTE 11 over Dry Creek?

The structure is 29 ft (8.8 m) long with a longest span of 24 ft (7.3 m) and a deck 58 ft wide.

Who owns RTE 11 over Dry Creek?

It is owned by the City or Municipal Highway Agency.