RTE 221 over Tributary E B Owego Cree
GoodCortland County, New York · .2 MI NE JCT SH38 & SH221 · Structure no. 000000001041750
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 45 ft
- 1 main span
- Daily traffic
- 1,299
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 221 over Tributary E B Owego Cree is a steel stringer/multi-beam or girder carrying RTE 221 over Tributary E B Owego Cree in Cortland County, New York. It was built in 2018, so it is 7 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,299 vehicles a day, roughly 10% of them trucks, projected to reach 1,816 by 2041. The structure is 45 ft (13.7 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 221 over Tributary E B Owego Cree built?
It was built in 2018, making it 7 years old in 2025.
What condition is RTE 221 over Tributary E B Owego Cree in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does RTE 221 over Tributary E B Owego Cree carry?
About 1,299 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is RTE 221 over Tributary E B Owego Cree?
The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13.1 m) and a deck 39 ft wide.
Who owns RTE 221 over Tributary E B Owego Cree?
It is owned by the State Highway Agency.