RTE 9H over Fitting Creek
FairColumbia County, New York · 6.2 MI N JCT SH 9H & SH23 · Structure no. 000000001006510
- Built
- 1937
- 88 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 41 ft
- 1 main span
- Daily traffic
- 7,676
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 9H over Fitting Creek is a steel stringer/multi-beam or girder carrying RTE 9H over Fitting Creek in Columbia County, New York. It was built in 1937, so it is 88 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,676 vehicles a day, roughly 8% of them trucks, projected to reach 7,712 by 2041. The structure is 41 ft (12.5 m) long and 48 ft wide. If it were closed, the detour would be 17.4 mi (28 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 9H over Fitting Creek built?
It was built in 1937, making it 88 years old in 2025.
What condition is RTE 9H over Fitting Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does RTE 9H over Fitting Creek carry?
About 7,676 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is RTE 9H over Fitting Creek?
The structure is 41 ft (12.5 m) long with a longest span of 34 ft (10.3 m) and a deck 48 ft wide.
Who owns RTE 9H over Fitting Creek?
It is owned by the State Highway Agency.