RTE 191 over RTE I87 RTE I87
FairPosted for loadClinton County, New York · At I87 Exit 41 · Structure no. 000000001034110
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 315 ft
- 6 main spans
- Daily traffic
- 2,160
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 191 over RTE I87 RTE I87 is a prestressed concrete stringer/multi-beam or girder carrying RTE 191 over RTE I87 RTE I87 in Clinton County, New York. It was built in 1962, so it is 63 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 2,160 vehicles a day, roughly 9% of them trucks, projected to reach 3,024 by 2040. The structure is 315 ft (96 m) long and 36 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 191 over RTE I87 RTE I87 built?
It was built in 1962, making it 63 years old in 2025.
What condition is RTE 191 over RTE I87 RTE I87 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does RTE 191 over RTE I87 RTE I87 carry?
About 2,160 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is RTE 191 over RTE I87 RTE I87?
The structure is 315 ft (96 m) long with a longest span of 58 ft (17.7 m) and a deck 36 ft wide.
Who owns RTE 191 over RTE I87 RTE I87?
It is owned by the State Highway Agency.