US Bridges

RTE 12 over Handsome Brook

Fair

Chenango County, New York · .4 MI N JCT SH 12 & SH12B · Structure no. 000000001009420

Built
2002
23 years old
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
78 ft
1 main span
Daily traffic
845
2021 count
Owner
State
State Highway Agency

About this bridge

RTE 12 over Handsome Brook is a prestressed concrete box beam or girders - multiple carrying RTE 12 over Handsome Brook in Chenango County, New York. It was built in 2002, so it is 23 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 845 vehicles a day, roughly 4% of them trucks, projected to reach 853 by 2041. The structure is 78 ft (23.8 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 12
CrossesHandsome Brook
Location.4 MI N JCT SH 12 & SH12B
RouteState Highway 12
Coordinates42.69525, -75.50074
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length78 ft (23.8 m)
Longest span74 ft (22.5 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic845 (2021)
Projected traffic853 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.3 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 12 over Handsome Brook built?

It was built in 2002, making it 23 years old in 2025.

What condition is RTE 12 over Handsome Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does RTE 12 over Handsome Brook carry?

About 845 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is RTE 12 over Handsome Brook?

The structure is 78 ft (23.8 m) long with a longest span of 74 ft (22.5 m) and a deck 33 ft wide.

Who owns RTE 12 over Handsome Brook?

It is owned by the State Highway Agency.