US Bridges

RTE 12 over West Brook

Fair

Chenango County, New York · 3.1 MI S JCT Rts 12 + 80 · Structure no. 000000001009400

Built
1929
96 years old
Condition
Fair
inspected May 2023
Type
Slab
Concrete
Length
28 ft
1 main span
Daily traffic
6,144
2021 count
Owner
State
State Highway Agency

About this bridge

RTE 12 over West Brook is a concrete slab carrying RTE 12 over West Brook in Chenango County, New York. It was built in 1929, so it is 96 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,144 vehicles a day, roughly 9% of them trucks, projected to reach 6,202 by 2041. The structure is 28 ft (8.5 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRTE 12
CrossesWest Brook
Location3.1 MI S JCT Rts 12 + 80
RouteState Highway 12
Coordinates42.63812, -75.48877
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating39 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckNot applicable
Main spans1
Design loadH 20
Structure length28 ft (8.5 m)
Longest span27 ft (8.2 m)
Deck width35 ft (10.6 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,144 (2021)
Projected traffic6,202 by 2041
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$672,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 12 over West Brook built?

It was built in 1929, making it 96 years old in 2025.

What condition is RTE 12 over West Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does RTE 12 over West Brook carry?

About 6,144 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is RTE 12 over West Brook?

The structure is 28 ft (8.5 m) long with a longest span of 27 ft (8.2 m) and a deck 35 ft wide.

Who owns RTE 12 over West Brook?

It is owned by the State Highway Agency.