US Bridges

RTE I86 over Center Street

Good

Chemung County, New York · .8 MI W JCT RTE 86I & 13 · Structure no. 000000001078161

Built
2007
18 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
115 ft
1 main span
Daily traffic
12,806
2010 count
Owner
State
State Highway Agency

About this bridge

RTE I86 over Center Street is a steel stringer/multi-beam or girder carrying RTE I86 over Center Street in Chemung County, New York. It was built in 2007, so it is 18 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,806 vehicles a day, roughly 21% of them trucks. The structure is 115 ft (35.1 m) long and 45 ft wide.

CarriesRTE I86
CrossesCenter Street
Location.8 MI W JCT RTE 86I & 13
RouteInterstate 86
Coordinates42.15779, -76.8228
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83.8 US tons
Inventory rating49.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length115 ft (35.1 m)
Longest span109 ft (33.3 m)
Deck width45 ft (13.7 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,806 (2010)
Projected traffic—
Trucks21%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I86 over Center Street built?

It was built in 2007, making it 18 years old in 2025.

What condition is RTE I86 over Center Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does RTE I86 over Center Street carry?

About 12,806 vehicles per day (2010 count), of which roughly 21% are trucks.

How long is RTE I86 over Center Street?

The structure is 115 ft (35.1 m) long with a longest span of 109 ft (33.3 m) and a deck 45 ft wide.

Who owns RTE I86 over Center Street?

It is owned by the State Highway Agency.