RTE I86 over Guthrie Run
FairChemung County, New York · 2.2 MI NE JCT RTE 17 + Cl · Structure no. 000000001012772
- Built
- 1956
- 69 years old, rebuilt 1994
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 52 ft
- 1 main span
- Daily traffic
- 15,791
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I86 over Guthrie Run is a steel stringer/multi-beam or girder carrying RTE I86 over Guthrie Run in Chemung County, New York. It was built in 1956 and reconstructed in 1994, so it is 69 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,791 vehicles a day, roughly 15% of them trucks, projected to reach 24,240 by 2041. The structure is 52 ft (15.8 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I86 over Guthrie Run built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1994.
What condition is RTE I86 over Guthrie Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does RTE I86 over Guthrie Run carry?
About 15,791 vehicles per day (2020 count), of which roughly 15% are trucks.
How long is RTE I86 over Guthrie Run?
The structure is 52 ft (15.8 m) long with a longest span of 47 ft (14.3 m) and a deck 41 ft wide.
Who owns RTE I86 over Guthrie Run?
It is owned by the State Highway Agency.