US Bridges

RTE I90 over Scott Creek

Fair

Chautauqua County, New York · 1.8 MI NE of Dunkirk Int · Structure no. 000000005511460

Built
1956
69 years old, rebuilt 1995
Condition
Fair
inspected July 2023
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
22,749
2020 count
Owner
Toll Authority
State Toll Authority

About this bridge

RTE I90 over Scott Creek is a concrete culvert carrying RTE I90 over Scott Creek in Chautauqua County, New York. It was built in 1956 and reconstructed in 1995, so it is 69 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 22,749 vehicles a day, roughly 40% of them trucks, projected to reach 25,494 by 2041. The structure is 31 ft (9.4 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesRTE I90
CrossesScott Creek
Location1.8 MI NE of Dunkirk Int
RouteInterstate 90
Coordinates42.47368, -79.27626
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating68 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length31 ft (9.4 m)
Longest span15 ft (4.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,749 (2020)
Projected traffic25,494 by 2041
Trucks40%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$2 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE I90 over Scott Creek built?

It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1995.

What condition is RTE I90 over Scott Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does RTE I90 over Scott Creek carry?

About 22,749 vehicles per day (2020 count), of which roughly 40% are trucks.

How long is RTE I90 over Scott Creek?

The structure is 31 ft (9.4 m) long with a longest span of 15 ft (4.6 m).

Who owns RTE I90 over Scott Creek?

It is owned by the State Toll Authority.