South Work Street over Chadakoin River
FairChautauqua County, New York · At Falconer South Work ST · Structure no. 000000003326060
- Built
- 1920
- 105 years old, rebuilt 1977
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 77 ft
- 1 main span
- Daily traffic
- 7,330
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
South Work Street over Chadakoin River is a prestressed concrete box beam or girders - multiple carrying South Work Street over Chadakoin River in Chautauqua County, New York. It was built in 1920 and reconstructed in 1977, so it is 105 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,330 vehicles a day, roughly 12% of them trucks, projected to reach 7,740 by 2041. The structure is 77 ft (23.5 m) long and 53 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Work Street over Chadakoin River built?
It was built in 1920, making it 105 years old in 2025. It was reconstructed in 1977.
What condition is South Work Street over Chadakoin River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does South Work Street over Chadakoin River carry?
About 7,330 vehicles per day (2018 count), of which roughly 12% are trucks.
How long is South Work Street over Chadakoin River?
The structure is 77 ft (23.5 m) long with a longest span of 75 ft (22.8 m) and a deck 53 ft wide.
Who owns South Work Street over Chadakoin River?
It is owned by the County Highway Agency.