Eiden Road over Prendergast Creek
FairChautauqua County, New York · 4.3 MI SE of Sherman · Structure no. 000000003325220
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 8
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Eiden Road over Prendergast Creek is a steel stringer/multi-beam or girder carrying Eiden Road over Prendergast Creek in Chautauqua County, New York. It was built in 1995, so it is 30 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8 vehicles a day, roughly 6% of them trucks, projected to reach 11 by 2039. The structure is 31 ft (9.4 m) long and 20 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Eiden Road over Prendergast Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is Eiden Road over Prendergast Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Eiden Road over Prendergast Creek carry?
About 8 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is Eiden Road over Prendergast Creek?
The structure is 31 ft (9.4 m) long with a longest span of 27 ft (8.2 m) and a deck 20 ft wide.
Who owns Eiden Road over Prendergast Creek?
It is owned by the County Highway Agency.