RTE 60 over W Harrison Street Chada
GoodChautauqua County, New York · 3.9 MI NW JCT US62 & SH62 · Structure no. 000000001027770
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 946 ft
- 6 main spans
- Daily traffic
- 11,178
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 60 over W Harrison Street Chada is a steel continuous stringer/multi-beam or girder carrying RTE 60 over W Harrison Street Chada in Chautauqua County, New York. It was built in 2010, so it is 15 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,178 vehicles a day, roughly 4% of them trucks, projected to reach 11,230 by 2041. The structure is 946 ft (288.3 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 60 over W Harrison Street Chada built?
It was built in 2010, making it 15 years old in 2025.
What condition is RTE 60 over W Harrison Street Chada in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does RTE 60 over W Harrison Street Chada carry?
About 11,178 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is RTE 60 over W Harrison Street Chada?
The structure is 946 ft (288.3 m) long with a longest span of 195 ft (59.5 m) and a deck 43 ft wide.
Who owns RTE 60 over W Harrison Street Chada?
It is owned by the State Highway Agency.