North Division Str over Owasco Outlet
GoodCayuga County, New York · .5 MI SW of State Prison · Structure no. 000000002207120
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 177 ft
- 2 main spans
- Daily traffic
- 4,557
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
North Division Str over Owasco Outlet is a steel continuous stringer/multi-beam or girder carrying North Division Str over Owasco Outlet in Cayuga County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,557 vehicles a day, roughly 5% of them trucks, projected to reach 5,535 by 2041. The structure is 177 ft (53.9 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Division Str over Owasco Outlet built?
It was built in 2019, making it 6 years old in 2025.
What condition is North Division Str over Owasco Outlet in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does North Division Str over Owasco Outlet carry?
About 4,557 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is North Division Str over Owasco Outlet?
The structure is 177 ft (53.9 m) long with a longest span of 90 ft (27.4 m) and a deck 46 ft wide.
Who owns North Division Str over Owasco Outlet?
It is owned by the City or Municipal Highway Agency.