RTE I88 over West Service Road Chena
GoodBroome County, New York · JCT I81&I88 -Chenango Rvr · Structure no. 000000001073962
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,874 ft
- 12 main spans
- Daily traffic
- 7,488
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I88 over West Service Road Chena is a steel continuous stringer/multi-beam or girder carrying RTE I88 over West Service Road Chena in Broome County, New York. It was built in 1989, so it is 36 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,488 vehicles a day, roughly 23% of them trucks, projected to reach 9,849 by 2041. The structure is 1,874 ft (571.2 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I88 over West Service Road Chena built?
It was built in 1989, making it 36 years old in 2025.
What condition is RTE I88 over West Service Road Chena in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does RTE I88 over West Service Road Chena carry?
About 7,488 vehicles per day (2011 count), of which roughly 23% are trucks.
How long is RTE I88 over West Service Road Chena?
The structure is 1,874 ft (571.2 m) long with a longest span of 188 ft (57.3 m) and a deck 41 ft wide.
Who owns RTE I88 over West Service Road Chena?
It is owned by the State Highway Agency.