RTE I81 over Fuller Road

Fair

Broome County, New York · 3.1 MI N of N Bing Cty Li · Structure no. 000000001031211

Built
1966
59 years old, rebuilt 2005
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
140 ft
3 main spans
Daily traffic
12,546
2009 count
Owner
State
State Highway Agency

About this bridge

RTE I81 over Fuller Road is a steel stringer/multi-beam or girder carrying RTE I81 over Fuller Road in Broome County, New York. It was built in 1966 and reconstructed in 2005, so it is 59 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,546 vehicles a day, roughly 26% of them trucks, projected to reach 17,564 by 2029. The structure is 140 ft (42.7 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I81
CrossesFuller Road
Location3.1 MI N of N Bing Cty Li
RouteInterstate 81
Coordinates42.16226, -75.89683
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87 US tons
Inventory rating52 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length140 ft (42.7 m)
Longest span50 ft (15.2 m)
Deck width33 ft (10.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,546 (2009)
Projected traffic17,564 by 2029
Trucks26%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.9 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I81 over Fuller Road built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2005.

What condition is RTE I81 over Fuller Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does RTE I81 over Fuller Road carry?

About 12,546 vehicles per day (2009 count), of which roughly 26% are trucks.

How long is RTE I81 over Fuller Road?

The structure is 140 ft (42.7 m) long with a longest span of 50 ft (15.2 m) and a deck 33 ft wide.

Who owns RTE I81 over Fuller Road?

It is owned by the State Highway Agency.