RTE 363 over Eldredge Street Pine ST
FairBroome County, New York · JCT Rts 363 + 11 · Structure no. 000000001008169
- Built
- 1965
- 60 years old, rebuilt 2001
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,547 ft
- 17 main spans
- Daily traffic
- 18,568
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 363 over Eldredge Street Pine ST is a steel stringer/multi-beam or girder carrying RTE 363 over Eldredge Street Pine ST in Broome County, New York. It was built in 1965 and reconstructed in 2001, so it is 60 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,568 vehicles a day, roughly 4% of them trucks, projected to reach 21,516 by 2041. The structure is 1,547 ft (471.5 m) long and 61 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 363 over Eldredge Street Pine ST built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2001.
What condition is RTE 363 over Eldredge Street Pine ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does RTE 363 over Eldredge Street Pine ST carry?
About 18,568 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is RTE 363 over Eldredge Street Pine ST?
The structure is 1,547 ft (471.5 m) long with a longest span of 115 ft (35 m) and a deck 61 ft wide.
Who owns RTE 363 over Eldredge Street Pine ST?
It is owned by the State Highway Agency.