RTE I95 over Hollers Avenue Eastches
FairBronx County, New York · 3.9 MI NW I295 & I95 · Structure no. 000000005075439
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 623 ft
- 5 main spans
- Daily traffic
- 76,473
- 2020 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
RTE I95 over Hollers Avenue Eastches is a steel continuous stringer/multi-beam or girder carrying RTE I95 over Hollers Avenue Eastches in Bronx County, New York. It was built in 1995, so it is 30 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 76,473 vehicles a day, roughly 19% of them trucks, projected to reach 97,717 by 2041. The structure is 623 ft (189.9 m) long and 106 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I95 over Hollers Avenue Eastches built?
It was built in 1995, making it 30 years old in 2025.
What condition is RTE I95 over Hollers Avenue Eastches in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does RTE I95 over Hollers Avenue Eastches carry?
About 76,473 vehicles per day (2020 count), of which roughly 19% are trucks.
How long is RTE I95 over Hollers Avenue Eastches?
The structure is 623 ft (189.9 m) long with a longest span of 163 ft (49.7 m) and a deck 106 ft wide.
Who owns RTE I95 over Hollers Avenue Eastches?
It is owned by the State Toll Authority.