Claremont Parkway over Metro No Commuter
GoodBronx County, New York · At Claremont · Structure no. 000000002241710
- Built
- 1889
- 136 years old, rebuilt 2013
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 16,820
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Claremont Parkway over Metro No Commuter is a prestressed concrete box beam or girders - multiple carrying Claremont Parkway over Metro No Commuter in Bronx County, New York. It was built in 1889 and reconstructed in 2013, so it is 136 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,820 vehicles a day, roughly 6% of them trucks, projected to reach 20,432 by 2041. The structure is 60 ft (18.3 m) long and 100 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Claremont Parkway over Metro No Commuter built?
It was built in 1889, making it 136 years old in 2025. It was reconstructed in 2013.
What condition is Claremont Parkway over Metro No Commuter in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Claremont Parkway over Metro No Commuter carry?
About 16,820 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is Claremont Parkway over Metro No Commuter?
The structure is 60 ft (18.3 m) long with a longest span of 58 ft (17.6 m) and a deck 100 ft wide.
Who owns Claremont Parkway over Metro No Commuter?
It is owned by the City or Municipal Highway Agency.