US Bridges

Ramp Es over I278 over Garrison Ave Ped Path 2

Good

Bronx County, New York · N Edgewater RD and Bruckn · Structure no. 000000001080510

Built
2022
3 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
736 ft
7 main spans
Daily traffic
—
2024 count
Owner
State
State Highway Agency

About this bridge

Ramp Es over I278 over Garrison Ave Ped Path 2 is a steel continuous stringer/multi-beam or girder carrying Ramp Es over I278 over Garrison Ave Ped Path 2 in Bronx County, New York. It was built in 2022, so it is 3 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 736 ft (224.3 m) long and 41 ft wide.

CarriesRamp Es over I278
CrossesGarrison Ave Ped Path 2
LocationN Edgewater RD and Bruckn
Coordinates40.82269, -73.88516
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93 US tons
Inventory rating45 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHL 93
Structure length736 ft (224.3 m)
Longest span125 ft (38.1 m)
Deck width41 ft (12.5 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck19 ft (5.8 m)

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$22.9 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp Es over I278 over Garrison Ave Ped Path 2 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Ramp Es over I278 over Garrison Ave Ped Path 2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Ramp Es over I278 over Garrison Ave Ped Path 2 carry?

No traffic count is recorded for this structure.

How long is Ramp Es over I278 over Garrison Ave Ped Path 2?

The structure is 736 ft (224.3 m) long with a longest span of 125 ft (38.1 m) and a deck 41 ft wide.

Who owns Ramp Es over I278 over Garrison Ave Ped Path 2?

It is owned by the State Highway Agency.