White Plains Road over RTE I278 RTE I278
FairBronx County, New York · 1.2 MI W I878+I95 · Structure no. 000000001066690
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 114 ft
- 2 main spans
- Daily traffic
- 17,564
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
White Plains Road over RTE I278 RTE I278 is a steel continuous stringer/multi-beam or girder carrying White Plains Road over RTE I278 RTE I278 in Bronx County, New York. It was built in 1968, so it is 57 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,564 vehicles a day, roughly 8% of them trucks, projected to reach 34,465 by 2041. The structure is 114 ft (34.7 m) long and 94 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was White Plains Road over RTE I278 RTE I278 built?
It was built in 1968, making it 57 years old in 2025.
What condition is White Plains Road over RTE I278 RTE I278 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does White Plains Road over RTE I278 RTE I278 carry?
About 17,564 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is White Plains Road over RTE I278 RTE I278?
The structure is 114 ft (34.7 m) long with a longest span of 55 ft (16.7 m) and a deck 94 ft wide.
Who owns White Plains Road over RTE I278 RTE I278?
It is owned by the State Highway Agency.