RTE I278 over Relief
FairBronx County, New York · 1 MI NE JCT I278 & I87 · Structure no. 00000000106666G
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 485 ft
- 7 main spans
- Daily traffic
- 143,338
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I278 over Relief is a steel continuous stringer/multi-beam or girder carrying RTE I278 over Relief in Bronx County, New York. It was built in 1962, so it is 63 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 143,338 vehicles a day, roughly 8% of them trucks, projected to reach 183,157 by 2041. The structure is 485 ft (147.8 m) long and 34 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I278 over Relief built?
It was built in 1962, making it 63 years old in 2025.
What condition is RTE I278 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does RTE I278 over Relief carry?
About 143,338 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is RTE I278 over Relief?
The structure is 485 ft (147.8 m) long with a longest span of 75 ft (22.8 m) and a deck 34 ft wide.
Who owns RTE I278 over Relief?
It is owned by the State Highway Agency.