RTE I95 over Bruckner Blvd Ramp from
FairBronx County, New York · JCT I95 & I878 & I78 · Structure no. 00000000106653A
- Built
- 1971
- 54 years old, rebuilt 2002
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,545 ft
- 11 main spans
- Daily traffic
- 112,258
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I95 over Bruckner Blvd Ramp from is a steel stringer/multi-beam or girder carrying RTE I95 over Bruckner Blvd Ramp from in Bronx County, New York. It was built in 1971 and reconstructed in 2002, so it is 54 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 112,258 vehicles a day, roughly 16% of them trucks, projected to reach 143,443 by 2041. The structure is 1,545 ft (470.9 m) long and 51 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I95 over Bruckner Blvd Ramp from built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2002.
What condition is RTE I95 over Bruckner Blvd Ramp from in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does RTE I95 over Bruckner Blvd Ramp from carry?
About 112,258 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is RTE I95 over Bruckner Blvd Ramp from?
The structure is 1,545 ft (470.9 m) long with a longest span of 175 ft (53.3 m) and a deck 51 ft wide.
Who owns RTE I95 over Bruckner Blvd Ramp from?
It is owned by the State Highway Agency.