US Bridges

RTE I95 over I-278 EB Ramp Bruckner

Fair

Bronx County, New York · JCT I95 & I278 & I295 · Structure no. 00000000106650A

Built
1970
55 years old, rebuilt 2002
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
1,103 ft
11 main spans
Daily traffic
—
2019 count
Owner
State
State Highway Agency

About this bridge

RTE I95 over I-278 EB Ramp Bruckner is a steel stringer/multi-beam or girder carrying RTE I95 over I-278 EB Ramp Bruckner in Bronx County, New York. It was built in 1970 and reconstructed in 2002, so it is 55 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 1,103 ft (336.2 m) long and 28 ft wide.

CarriesRTE I95
CrossesI-278 EB Ramp Bruckner
LocationJCT I95 & I278 & I295
RouteInterstate 95
Coordinates40.82797, -73.84562
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85 US tons
Inventory rating51 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans11
Design loadHS 20
Structure length1,103 ft (336.2 m)
Longest span127 ft (38.7 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks13%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$24.3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I95 over I-278 EB Ramp Bruckner built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2002.

What condition is RTE I95 over I-278 EB Ramp Bruckner in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does RTE I95 over I-278 EB Ramp Bruckner carry?

No traffic count is recorded for this structure.

How long is RTE I95 over I-278 EB Ramp Bruckner?

The structure is 1,103 ft (336.2 m) long with a longest span of 127 ft (38.7 m) and a deck 28 ft wide.

Who owns RTE I95 over I-278 EB Ramp Bruckner?

It is owned by the State Highway Agency.