Greenwich Street over Phillips Creek
GoodAllegany County, New York · 0.11 MI SE of US Route 24 · Structure no. 000000002214000
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 145 ft
- 1 main span
- Daily traffic
- 1,782
- 2020 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Greenwich Street over Phillips Creek is a steel stringer/multi-beam or girder carrying Greenwich Street over Phillips Creek in Allegany County, New York. It was built in 1997, so it is 28 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,782 vehicles a day, roughly 3% of them trucks, projected to reach 2,495 by 2040. The structure is 145 ft (44.2 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenwich Street over Phillips Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is Greenwich Street over Phillips Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Greenwich Street over Phillips Creek carry?
About 1,782 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Greenwich Street over Phillips Creek?
The structure is 145 ft (44.2 m) long with a longest span of 140 ft (42.6 m) and a deck 35 ft wide.
Who owns Greenwich Street over Phillips Creek?
It is owned by the Town or Township Highway Agency.