RTE 961 over Canacadea Creek
GoodAllegany County, New York · At JCT Rts 21 + 244 · Structure no. 000000001042910
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 1,011
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 961 over Canacadea Creek is a prestressed concrete stringer/multi-beam or girder carrying RTE 961 over Canacadea Creek in Allegany County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,011 vehicles a day, roughly 11% of them trucks, projected to reach 1,054 by 2041. The structure is 62 ft (18.9 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 961 over Canacadea Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is RTE 961 over Canacadea Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does RTE 961 over Canacadea Creek carry?
About 1,011 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is RTE 961 over Canacadea Creek?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 40 ft wide.
Who owns RTE 961 over Canacadea Creek?
It is owned by the State Highway Agency.